Showing posts with label Welding. Show all posts
Showing posts with label Welding. Show all posts

Sunday, April 24, 2011

How To: 240z Ground Control Coilovers w/ Sectioned Struts

This weekend I was finally able to finish my suspension build.

From Z2


A few weeks ago my buddy Bruce came over and we measured everything and read all of the instructions for the build.

From Z2


We used a combination of the instructions that shipped with the Ground Control kit and the write up by John Coffey from Beta Motorsports available HERE. Read the whole article, but the last part is what was most helpful since it is specific to the Tokico Ilumina BZ3099 and BZ3015 Inserts.

Everything I read gave different measurements, but the basic information was the same. Cut the strut tubes in half and remove a section from the top equal to the difference in length between the stock struts and the struts you are installing.

This is easy enough but I had to find my own measurements and cut and section the tubes strategically so everything fits and works. The most important measurement of this whole thing, is the overall height of the tube as measured from the inside (Internal Height).

Here are the measurements for sectioning 1973 Datsun 240z strut tubes to work with BZ3099 (AW11 MR2 Rear), and BZ3015 (240z Front) strut cartridges. But please remember, before cutting or welding anything, measure everything like nine times.

Front:
First, remove the stock spring perch with an angle grinder.

From Z2


From Z2


You will have to grind off the welded perch ring so that the strut tube is smooth.

From Z2


The first cut you make is to cut the strut tube in half 6.5" up from the top of the spindle casting.

From Z2


From Z2


Cutting at 6.5" gives you enough room to install the new spring perch later whithout interfering with the stock brake line bracket.

From Z2


Now the overall internal height of this tube needs to be 13.5". My stock internal height was 15" so in order to achieve this measurement I had to cut 1.5" from the bottom of the top strut tube section, making the top piece 7" long when all is said and done.

From Z2


From Z2


When you are using a big baller pipe cutter like mine it creates a lip on the inside of the tube where it cuts. This lip needs to be ground out or you will not be able to slide your strut cartridges in.

From Z2


Once you get them cleaned up it's time to weld them back on.

Luckily my stock strut cartridges were blown so I didn't have to worry about heating them up too much. I was able to use them as guides for welding the tubes perfectly straight.

From Z2


Then weld them up!

From Z2


Once Bruce was done working his metal magic, I had to grind down the weld a bit so I could slide the new perches over them.

From Z2


This is the sectioned and welded strut tube with the new perch location measured and marked with the perch around it ready to weld in. I welded the new perch so that the bottom of it was 5.5" from the top of the spindle casting. Also, make sure that the flat side of the new perch is facing the spindle side.

From Z2


Tack it up and weld it in.

From Z2


From Z2


From Z2


Once it's welded all the way around you're done!

Test fit.

From Z2


Since the first one went pretty much perfectly (except for the whole stuck cartridge housing fiasco), we just repeated these steps for the other front strut tube.


Rear:

The rear strut tubes were a little easier to do because if you cut it right, you can cut the original perch weld right out of the tube without grinding it all the way down.

You do however have to cut it off.

From Z2


Once the stock perch is gone, you need to cut the strut tube in half at 8.5", as measured upward from the top of the hub casting.

From Z2


From Z2


Grind out the lip.

From Z2


The stock rear strut tubes measure 16.75" tall as measured from the inside. Since I am running front struts in the rear I need to cut them so that when welded up, they will measure 15" from the inside. This meant I had to cut 1.75" from the bottom of the top section of the strut tube.

From Z2


Once cut, I test fitted the new strut and it fits perfect. Just enough room for the threaded cap.

From Z2


Again I used the blown rear strut to help align the strut tube for welding. Never do this with a strut tube that is not blown.

From Z2


Grind down the weld so the perch can slide over it.

From Z2


Then have your buddy weld up the perch. The rear perch should be welded so that the bottom of the perch is 7" from the top of the hub casting. This places the previous weld under the threaded tube and out of sight.

From Z2


From Z2


Once that perch is welded all the way around you're done!

Test fit.

From Z2


Just do the same thing with the second rear strut tube and you're dancing.

From Z2


Please take this as a reference on how it worked for me. If you are going to be installing these parts, make sure you take all of your own measurements and confirm whether or not these will work for you.

The worst thing you can do is cut these strut tubes too short. The overall internal height needs to be very precise and cutting them too short is not easily fixable.

Hope this helps some of you guys that are thinking about building this setup.

If anyone notices any technical errors or if something is unclear, please post up so I can fix it.

Thanks to Beta Motorsports for the writeup! That proved to be very helpful and special thanks to my buddy Bruce who is the mack daddy boss man welder master of the universe.

From Z2


Peace.

Monday, April 4, 2011

Suspension Build (Teaser)

This weekend my buddy Bruce, of Bruce Bruce Professional Welding Incorporated, LLC. stopped by and we hacked through getting all of the measurements together, cutting out the proper sections, and constructed one 100% successful strut tube.

From Z2


Much much more to come as I get the write up together.
This will be a multi part post and will include all of my measurement and assembly detail.

I love this crap.

Monday, March 28, 2011

Energy Suspension, Painting, and Floors

Finally finished gathering all of the Energy Suspension bushings for the 240z chassis.

From Z2


This is the entire HyperFlex kit aside from the end link bushings since I am not going to be running a stock set of sway bars, I am going to wait until I get my hands on them to acquire the bushings.

Big thanks to Pete for helping me get all of these together!



Whipped out the tried and true, Hammered Finish spray paint from Rustoleum. Dark Bronze (Gunmetal) again.

From Z2


Spraying all of my front suspension components. Two coats all around.

From Z2


Looking mighty sharp.

From Z2


These steering knuckles have never been happier.

From Z2


Front LCAs etc.

From Z2


ALSO...

Not that you could tell from this pic, but I have just finished stripping all the under coating off of the floors and I was able to finish welding up all of the little pinholes I found. 4 total.

From Z2


From Z2


From Z2


From Z2


The driver side is all ground down and ready for cleaning and painting. Just need a little grind session on the passenger side and the inside will be ready to seal.

Not before I strip the paint and undercoating residue off the floors tonight.

Tuesday, December 14, 2010

Welding Shit up!

Finally got my hands on a welder!

From Z2


Tim brought over his Hobart 110v Mig welder. It was running solid core 22ga. copper coated wire. He also brought an awesome Craftsman air cutter, and a die grinder.

I brought the beer.

From Z2


As you can see the seat bracket was broken by the previous owner, and there is a little hole under the floor mat hook that needs to be ground out and patched up.

From Z2


We marked out the lines that we would have to cut off of the seat bracket so we are able to make nice straight welds and ensure that the seat bracket will hold up.

From Z2


This die grinder was perfect for cleaning up the holes in the floor.

From Z2


It was gentle enough so that it was difficult to remove more material than we had to, which is great since we just wanted to remove the corroded rusty shit.

From Z2


We just hit this with a wire brush and it was ready to go.

From Z2


I have to get one of these rotary cutters.

From Z2


It literally cut through 16ga steel like butter.

From Z2


Finishing cutting out the junk metal.

From Z2


I just picked up a small plate of 16ga steel at Home Depot. Cut it up with some tin snips and clamped it on.

From Z2


WELDING!!!

From Z2


From Z2


From Z2


Not too shabby for my first welds ever! :D

From Z2


The first run on the seat bracket is complete.

I need to grind down my giant welds and patch up the inevitable holes and such. I need this to be a pretty diesel bracket as I am a beast and will surely break it if it is weak. I will also be tacking up the floors next.

Big thanks to Tim for coming over and teaching me how to weld. I can't wait to get my own gear and start fabbing up my own gear!